“Risk Assessment on The Bandung Hilton Hotel Construction Project Utilizing The FMEA and FTA Methods”. CIVED 11, no. 2 (June 30, 2024): 738–747. Accessed May 17, 2026. https://cived.ppj.unp.ac.id/index.php/CIVED/article/view/604.