Risk Assessment on The Bandung Hilton Hotel Construction Project Utilizing The FMEA and FTA Methods

Authors

  • Lily Kholida Department of Civil Engineering, Mercu Buana University, Indonesia
  • Nadia Tutur Melina Lubis Department of Civil Engineering, Mercu Buana University, Indonesia
  • Zel Citra Department of Civil Engineering, Mercu Buana University, Indonesia
  • Elhazri Hasdian Department of Civil Engineering, Mercu Buana University, Indonesia

DOI:

https://doi.org/10.24036/cived.v11i2.604

Keywords:

Risk Analysis, Work Accident, High-Rise Building, Failure Mode and Effect Analysis Method, Fault Tree Analysis Method

Abstract

Risk is the possibility or uncertainty of unexpected events occurring during the implementation of work which could harm the party carrying out the activity, the example is a risk of work accidents. The potential risk of work accidents also occurs in the Hilton Hotel Construction Project in Kota Baru Parahyangan - West Bandung. The project is a high-rise building with a height of 23 floors which of course has a fairly high risk of work accidents. This research aims to find out the dominant risk and its factors.This research applied two methods in analyzing, those methods are Failure Mode and Effect Analysis Method (FMEA) and Fault Tree Analysis Method (FTA). Having can be identified and analyzed that risks by using those methods, this research did some steps by using Method for Obtain Cut Set (MOCUS) for finding basic event combination.The results of this research are to determine the dominant risk of work accidents using the FMEA method, namely the activity of workers falling from a height during glass installation work with an RPN value of 26,3. Based on the FTA method, it produces 16 basic events are feeling unwell, lack of concentration, lack of enthusiasm for work, excessive joking, not seeing signs, lack of communication, lack of supervision time, lack of K3 training, less comfortable using PPE, limited amount of PPE, lack of training, lack of experience, signs that are too small, signs blocked by objects, slippery roads due to rain, and a messy work environment.

Downloads

Download data is not yet available.

References

Apriyan, & Setiawan, H. (2017). Analisis Risiko Kecelakaan Kerja Pada Proyek Bangunan Gedung Dengan Metode FMEA. https://journal.untar.ac.id/index.php/jmistki/article/download/419/364

Arifin, Z. (2022). Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) Untuk Meminimalkan Kecelakaan Kerja Dengan Metode Fault Tree Analysis Di Pt. Sumber Sukses Ganda. Jurnal Profisiensi, 10(1), 68–76.

Bastuti, S. (2019). Analisis Risiko Kecelakaan Kerja Dengan Metode Failure Mode And Effect Analysis (FMEA) Dan Fault Tree Analysis (FTA) Untuk Menurunkan Tingkat Risiko Kecelakaan Kerja (PT. Berkah Mirza Insani). In Maret (Vol. 2, Issue 1).

Council of Standards Australia. (2004). AS/NZS 4360:2004. www.standards.co.nz

Fathoni, M. Z. (2020). Analisis Risiko Pada Proyek Pembuatan Lintel Set Point Dengan Metode Kualitatif (Studi Kasus : PT. XYZ). XIV(2), 113–126.

Hakim, L., Murtiadi, S., & . A. (2023). An Analysis of Work Accident Risk in the Construction of the RSUD ER Building West Lombok District Using Fault Tree Analysis (FTA). RESEARCH REVIEW International Journal of Multidisciplinary, 8(7), 111–120. https://doi.org/10.31305/rrijm.2023.v08.n07.015

Hardiansah, Sukmono, Y., & Widyarini Saptaningtyas, W. (2023). Analisis Risiko Kecelakaan Kerja Dengan Metode Failure Mode and Effect Analysis (FMEA) dan Fault Tree Analysis (FTA) (Studi Kasus: Bengkel Dinamis) (Vol. 1, Issue 1).

Harianto, F., Septian, E., Tria, F., & Aulady, M. F. N. (2022). Risiko dan Pengendalian Kecelakaan Kerja Pada Pelaksanaan Pekerjaan Struktur Basement Hotel Shafira Surabaya.

ISO:31000. (n.d.).

J, A., H, S., & W.I, E. (2017). Analisis Risiko Kecelakaan Kerja pada Proyek Bangunan Gedung Dengan Metode FMEA.

Mufiq, M., & Huda, M. (2020). Risk Assesment Kecelakaan Kerja Pekerjaan Struktur Bangunan Mall Dan Apartement Menggunakan Metode Fail-Ure Mode And Effect Analysis (FMEA). Jurnal Rekayasa Dan Manajemen Konstruksi, 8(1), 045–056.

Noor, R., Harianto, F., & Susanti, E. (2018). Karakteristik Kecelakaan Kerja Pada Pelaksanaan Proyek Konstruksi Di Surabaya. https://jurnal.itats.ac.id/wp-content/uploads/2018/08/Proseding-SNTEKPAN-II-ITATS-2014-Karakteristik-Kecelakaan-Kerja-Pada-Pelaksanaan-Proyek-Konstruksi-Di-Surabaya.pdf

Nugroho, S. A., Suliantoro, H., & Utami, N. (2018). Analisis Risiko Kecelakaan Kerja Pada Proyek Pembangunan Dengan Menggunakan FMEA Dan FTA (Studi Kasus: Hotel Srondol Mixed Used Kota Semarang).

Nur, M., & Ariwibowo, O. (2018). Analisis Kecelakaan Kerja dengan Menggunakan Metode FTA Dan 5s di PT. Jingga Perkasa Printing. In Jurnal Teknik Industri (Vol. 4, Issue 1).

Ramadani, G. (2022). Analisis Risiko Keselamatan Dan Kesehatan Kerja Pada Pembangunan Hotel JL.S.Parman Kota Samarinda. 1–16.

Siswanto, A., Afif Salim, M., & Sofi Ardani, M. (2021). Analisis Manajemen Risiko K3 Dengan Metode Hazard Identification Risk Assesment & Determining Control Pada Proyek Pembangunan Hotel Quest.

Surat Edaran Nomor 04/SE/M/2021 tentang Pedoman Penerapan Manajemen Risiko di Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2021).

Unitomo, S., Bustamin, M. O., Nugroho, W. A., & Kuroumang, U. U. (2022). Analisis Risiko Kecelakaan Kerja pada Proyek Apartemen Klaska Residence Surabaya. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 4(2), 82–89. https://doi.org/10.26740/proteksi.v4n2.p82-89

Wang, Y. M., Chin, K. S., Poon, G. K. K., & Yang, J. B. (2009). Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean. Expert Systems with Applications, 36(2 PART 1), 1195–1207. https://doi.org/10.1016/j.eswa.2007.11.028

Downloads

Published

2024-06-30

How to Cite

Kholida, L., Melina Lubis, N. T., Citra, Z., & Hasdian, E. (2024). Risk Assessment on The Bandung Hilton Hotel Construction Project Utilizing The FMEA and FTA Methods. CIVED, 11(2), 738–747. https://doi.org/10.24036/cived.v11i2.604

Issue

Section

Articles