Asyari, S. A. P. and Putra, I. N. D. P. (2023) “Analysis of Project Delay Using the Fault Tree Analysis (FTA) Method in Rising Building Projects”, CIVED, 10(3), pp. 846–853. doi: 10.24036/cived.v10i3.31.