Asyari, S. A. P., & Putra, I. N. D. P. (2023). Analysis of Project Delay Using the Fault Tree Analysis (FTA) Method in Rising Building Projects. CIVED, 10(3), 846–853. https://doi.org/10.24036/cived.v10i3.31