[1]
Rahman, A.S.S. and Kesuma, S.A. 2023. Analisis Penyebab Terjadinya Contract Addendum pada Proyek Pembangunan Gedung SBSN Kampus III UIN Imam Bonjol Padang. CIVED. 10, 1 (Mar. 2023), 288–295. DOI:https://doi.org/10.24036/cived.v10i1.384112.