[1]
Febrianti, S.S. and Giatman, M. 2024. Life Cycle Cost Analysis in Flat Buildings (Case Study of Polresta Bukittinggi Flat Construction Project). CIVED. 11, 2 (Jun. 2024), 625–633. DOI:https://doi.org/10.24036/cived.v11i2.579.