[1]
Asyari, S.A.P. and Putra, I.N.D.P. 2023. Analysis of Project Delay Using the Fault Tree Analysis (FTA) Method in Rising Building Projects. CIVED. 10, 3 (Sep. 2023), 846–853. DOI:https://doi.org/10.24036/cived.v10i3.31.