[1]
2024. Risk Assessment on The Bandung Hilton Hotel Construction Project Utilizing The FMEA and FTA Methods. CIVED. 11, 2 (Jun. 2024), 738–747. DOI:https://doi.org/10.24036/cived.v11i2.604.