Abstract

The productivity of overburden stripping is highly dependent on the productivity and work compatibility of the mechanical tools used. This research was carried out on the work load excavator (Fleet 1825) at Pit Banko Tengah A, PT Bukit Asam (Persero) Tbk. with the aim of analyzing the productivity level of the excavation and loading equipment, determining the work compatibility value (match factor), and evaluating the number of transportation equipment needs. Based on actual observations, obstacles were found in the form of piles of soil (spoil) on the side of the road and undulating transport road surface conditions. Road conditions that do not meet these standards result in narrowing of lanes, a decrease in the average speed of means of transportation, and an increase in cycle time. This study uses a quantitative method with primary data collection which includes cycle time, effective working time, and the number of  digging and loading bucket fills. The results of the analysis showed that the actual productivity of the Komatsu PC 2000-8 excavator excavator reached 914.57 BCM/Hour, while the productivity of the Komatsu HD-785 Dump Truck was 164.7 BCM/Hour. The assessment of work compatibility between 1 unit of excavation equipment and 7 units of transport equipment resulted in  a Match Factor (MF) value of 1.25. The MF value of > 1 indicates the occurrence of queues and waiting times for transportation equipment in the work area. Based on the evaluation of productivity suitability, it is recommended to reduce the number of transportation equipment from 7 units to 6 units so that the production target runs optimally and efficiently. In addition to optimizing the compatibility of digging loading and transporting equipment, it is recommended to standardize the geometry of the transport road according to regulations to minimize obstacle time.

Downloads

Download data is not yet available.

References

[1]. Ersyad, F., Yulhendra, D., & Prabowo, H. (2018). Kajian Teknis dan Ekonomis Perancangan Design Kemajuan Penambangan Quarry Batukapur pada Bulan April–Agustus 2017 di Front III B–IV B Bukit Karang Putih PT. Semen Padang. Bina Tambang, 3(3), 1185-1201.

[2]. Ananda, A. D., Rahman, H. A., & Prabowo, H. (2023). Analisis Keserasian Alat Gali Muat dan Angkut Batubara Dalam Produksi Overburden Di Pit Alam 1-3 Di PT. Muara Alam Sejahtera, Kabupaten Lahat, Sumatera Selatan. Bina Tambang, 8(3), 33-41.

[3]. Dian, M., & Prabowo, H. (2020). Produktivitas Pemboran Inpit pada Bukit Everest 9N2/TB. 19005, 9N2/TB. 19001, 9N2/TB. 19002 dan 9N2/TB. 19004 di PT. ANTAM Tbk. UBPN SULTRA. Bina Tambang, 5(2), 56-65.

[4]. Nugraha, M. F. (2023). Optimalisasi Alat Gali Muat dan Alat Angkut pada Aktivitas Pengupasan Overburben Bulan Februari 2023 di Pit 4 SBE PT. Asia Multi Investama, Site Muaro Kilis, Tengah Ilir, Tebo, Jambi (Doctoral dissertation, Universitas Negeri Padang).

[5]. Alfarizi, P., & Prabowo, H. (2024). Assessment of Productivity and Compatibility of Komatsu PC 2000 Loader and Komatsu HD 785 Transport Equiptment in Overburden Stripping Activities in the North Pit of Muara Tiga Besar Mining Area at PT. Bukit Asam, Tbk. Tanjung Enim, South Sumatra. Bina Tambang, 9(1), 69-73.

[6]. Alifa, A., Gusman, M., & Prabowo, H. (2018). Optimasi Alat Gali Muat Dan Alat Angkut Terhadap Produksi Batubara Dengan Metode Kapasitas Produksi Dan Metode Teori Antrian Pada Pit Taman Periode Oktober 2016 Unit Pertambangan Tanjung Enim Pt. Bukit Asam (Persero) Tbk. Bina Tambang, 3(2), 807-818.

[7]. Isgianda, F., Sumarya, S., & Prabowo, H. (2018). Evaluasi Biaya Dan Kebutuhan Alat Angkut Dan Alat Muat Pengupasan Lapisan Tanah Penutup (Overburden) Pit B PT. Bina Bara Sejahtera Kecamatan Ulok Kupai, Kabupaten Bengkulu Utara, Provinsi Bengkulu. Bina Tambang, 3(3), 1255-1261.

[8]. Zara, M., & Prabowo, H. (2020). Kajian Teknis Geometri Jalan Angkut dan Pengaruhnya Terhadap Produksi Alat Angkut pada Penambangan Batu Andesit di PT. Ansar Terang Crushindo 1Kecamatan Pangkalan Koto Baru, Sumatera Barat. Bina Tambang, 5(5), 20-31.

[9]. Zuhri, F. A. D., & Prabowo, H. (2024). GEOMETRY AND MAINTENANCE ANALYSIS OF ALL WHEATER ROAD (AWR) TS+ 35 TO TLS 2 TAMBANG AIR LAYA, PT. BUKIT ASAM, TBK. ANJUNG ENIM, SOUTH SUMATRA. Bina Tambang, 9(1), 11-18.

[10]. Prabowo, H., Hutmi, R., & Dewata, I. (2023). Optimizing Digging Equipment Productivity Using Overall Equipment Effectiveness (OEE) Method in Coal Overburden Mining Activities. INVOTEK: Jurnal Inovasi Vokasional dan Teknologi, 23(2), 99-108.

[11]. Prabowo, H., & Febriani, C. (2023). Analysis of the Relationship between Road Slope and Total Resistance to Fuel Consumption of Sany Skt 90s Dump Truck. MOTIVECTION: Journal of Mechanical, Electrical and Industrial Engineering, 5(2), 397-414.

[12]. Hutmi, R., & Prabowo, H. (2022). Perhitungan Perbandingan Tonase Bauksit Menggunakan Data Truck Count, dan Tonase Hasil Analisa Laboratorium di Bauxite Processing Plant 1 dan 2 PT. Jaga Usaha Sandai-Site sandai, Sandai Kiri, Kecamatan Sandai, Kabupaten Ketapang, Kalimantan Barat. Bina Tambang, 7(1), 1-11.Shaddad, A. R. (2017). Analisis keserasian alat mekanis (match factor) untuk peningkatan produktivitas. Jurnal Geomine, 4(3).

[13]. Hendri, G. O., Maiyudi, R., Prabowo, H., & Anarta, R. (2023). Evaluasi Pengupasan Volume Overburden Menggunakan Data Truck Count Monitoring dan Joint Survey di Pit Batu Tegak PT. Andalan Artha Primanusa Jobsite PT. Budi Gema Gempita, Merapi Timur, Kabupaten Lahat, Sumatera Selatan. Bina Tambang, 8(2), 90-97.

[14]. Sosantri, B. J., Yulhendra, D., & Prabowo, H. (2018). Optimalisasi Peralatan Tambang dengan Metoda Overall Equipment Effectiveness (OEE) di PIT 1 Penambangan Batubara Banko Barat PT Bukit Asam (Persero) Tbk Tanjung Enim Sumatera Selatan. Bina Tambang, 3(2), 702-721.

[15]. Sandeir, E., & Prabowo, H. (2018). Evaluasi Kebutuhan dan Estimasi Biaya Alat Muat Kobelco 380 dan Hitachi 350 Dengan Alat Angkut Scania P360 dan Mercedez Actroz 4043 Pada Pengupasan Overburden PT. Caritas Energi Indonesia Jobsite KBB, Sarolangun. Bina Tambang, 3(3), 1091-1100.

[16]. Wati, M. F. A., & Prabowo, H. (2024). Mining Activities at the Pit 2 Electrification Mine Location at West Banko PT Bukit Asam, Tbk. Tanjung Enim, South Sumatera. Bina Tambang, 9(1s), 20-27.Anisari, Rezky. "Keserasian Alat Muat dan Angkut Untuk Kecapaian Target Produksi Pengupasan Batuan Penutup Pada PT. Unirich Mega Persada Site Hajak Kabupaten Barito Utara Kalimantan Tengah." Jurnal INTEKNA: Informasi Teknik dan Niaga 12.1 (2012).

[17]. Isgianda, F., Sumarya, S., & Prabowo, H. (2018). Evaluasi Biaya Dan Kebutuhan Alat Angkut Dan Alat Muat Pengupasan Lapisan Tanah Penutup (Overburden) Pit B PT. Bina Bara Sejahtera Kecamatan Ulok Kupai, Kabupaten Bengkulu Utara, Provinsi Bengkulu. Bina Tambang, 3(3), 1255-1261.

[18]. Prabowo, H., Premana, H., & Amrina, E. (2023). Keserasian Kerja Alat Gali Muat Excavator Volvo Ec330 Blc Dan Alat Angkut Dump Truck Mercedes Benz Axor 2528 C Pada Kegiatan Coal Getting Seam B. Jurnal Sains dan Teknologi: Jurnal Keilmuan dan Aplikasi Teknologi Industri, 23(1), 86-98.

[19]. Prabowo, H., & Marcelino, U. Z. D. (2023). Kajian Teknis Produktifitas dan Keserasian Excavator dengan Dump Truck pada Kegiatan Coal Getting Seam 18 PT. Kurnia Alam Investama Kabupaten Batanghari Provinsi Jambi. CIVED, 10(2), 398-408.

Downloads

Published

2025-06-30

How to Cite

Work Compatibility of Loading Excavators and Conveying Equipment in The Stripping of Overburden Pc 2000. (2025). CIVED, 12(2), 429-440. https://doi.org/10.24036/b0yv0s51