Analysis of Project Cost Estimation as an Effort to Improve Construction Project Time Performance
DOI:
https://doi.org/10.24036/cived.v12i1.679Keywords:
Cost Estimation, Construction Projects, Time performanceAbstract
Construction project management aims to manage time, cost, and resources effectively and efficiently so that the project can be completed according to plan. However, in practice, many construction projects, especially in the Medan City area, experience significant delays and cost overruns. This is due to inaccurate cost and time estimates, as well as lack of attention to various internal factors. This study aims to analyze project cost estimation as an effort to improve construction project time performance. Data were collected from 201 respondents working in the construction sector with varying educational backgrounds and work experiences. The analysis was conducted using the covariance-based Structural Equation Modeling (CB-SEM) approach with the help of AMOS software, as well as the Maximum Likelihood Estimation technique to estimate project duration. The results of the study indicate that project cost estimation is significantly influenced by three main factors, namely Budgeted Cost of Work Schedule (BCWS), Actual Cost of Work Performed (ACWP), and Budgeted Cost of Work Performed (BCWP). Meanwhile, the time performance factor does not have a significant effect on cost estimation. On the other hand, project time performance is influenced by the availability of labor, main equipment, funding, and implementation methods. The feasibility test of the model using Goodness of Fit indicators such as CMIN, RMSEA, TLI, NFI, and CFI shows that the model used meets the Absolute Fit Model criteria, so it can be concluded that the relationship between variables in this research model is valid and can be used to support decision making in construction project management.
Downloads
References
Nanda, M. P., Kurniawati, M., & Riswanto, S. (2023). Penggunaan Metode Project Evaluation Review Technique (Pert) Dalam Evaluasi Perencanaan Penjadwalan Proyek. Jurnal Teknik Sipil, 163-173.
Kehinde, O. M. (2017). Application of Project Evaluation and Review Technique (PERT) in Road Construction Projects in Nigeria. EuropeanProject Management Journal, 7(2), 3–13.
Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Simultaneously
M. Stanitsas, K. Kirytopoulos, and V. Leopoulos, “Integrating sustainability indicators into project management: The case of construction industry,” J. Clean. Prod., vol. 279, 2021, doi: 10.1016/j.jclepro.2020.123774
Nasehudin, T. S., & Gozali, N. (2012). Pendekatan penelitian kuantitatif.
Leonda Gesti, (2008), Studi Keterlambatan Penyelesaian Proyek Konstruksi Pada Tahun 2007 Di Daerah Belitung, Universitas Islam Indonesia, Yogyakarta
Yunita Afliana Messah, et all, 2013, Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstuksi Gedung Di Kota Kupang, Jurnal Teknik Sipil, Vol. II, No. 2, September 2013
I Gede Ngurah Sunatha, et al, 2023, Kinerja Biaya Dan Waktu Proyek Dengan Metode Earned Value Management, Jurnal Teknik Gradien Vol. 15, No. 02, Oktober 2023, Hal. 39 - 47 e-ISSN: 2797-0094
Sopian Tamba, Deni Maisandi Hutauruk, 2018, Optimasi Biaya Dan Waktu Akibat Penjadwalan Ulang Pada Proyek Perumahan Menggunakan Microsoft Project, Journal of Civil Engineering, Building and Transportation, Volume 2 (1) Maret 2018:34-41
Ida Bagus Gede Indramanik, Ni Kadek Astariani, dan I Wayan Sudiarsana, 2022, Analisa Kinerja Biaya Dan Waktu Menggunakan Metode Konsep Nilai Hasil (Earned Value Concept) (Studi Kasus: Proyek Pembangunan Gedung Ruang Kelas Baru Madrasah Tsanawiyah Negeri (Mtsn), Amlapura, Kabupaten Karangasem), Jurnal Teknik Gradien Vol. 14, No. 02, Oktober 2022, Hal. 37 – 48
Yessy C.S. Pandeiroth, 2018, Analisa Penerapan Manajemen Waktu Pada Pelaksanaan Proyek Konstruksi di Kota Manado Jurnal Frontiers Vol 1 No 3, Desember 2018, Universitas Negeri Manado
Wingky P. R. Wilar, Grace Y. Malingkas, Jantje B. Mangare, 2025, Penerapan Manajemen Waktu Dengan Metode CPM (Critical Path Method) Pada Proyek Pembangunan Laboratorium SMKS Kema Perintis, Jurnal Tekno Universitas Sam Ratulangi, Vol. 23 No. 91 (2025).
Andi H. Rizal, Yuvita, Rosmiyati, 2023, Faktor-Faktor Penghambat Yang Berpengaruh Terhadap Kinerja Waktu Pelaksanaan Proyek Pembangunan Gedung, Jurnal Teknik Sipil Undana, Vol. 12, No. 1, April 2023
Deden Matri Wirabakti, Rahman Abdullah, Andi Maddeppungeng, 2014, Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung, Jurnal Konstruksia Volume 6 Nomer 1 Desember 2014
Randy Putra Agritama, Miftahul Huda, Titien Setiyo Rini, 2018, Faktor – Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi Di Surabaya, Axial, Jurnal Rekayasa dan Manajemen Konstruksi Vol 6 No.1, April 2018, Hal 25-32Setiawan, F. 2012. Penjadwalan proyek. Retrieved July 25, 2016, from https://farmysetiawan.wordpress.com/2012/04/07/penjadwalan-proyek

Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Semedi Napitupulu, Mardiaman, Syafiatun Siregar

This work is licensed under a Creative Commons Attribution 4.0 International License.