Analysis of Project Time and Cost using the Crash Program Approach
DOI:
https://doi.org/10.24036/cived.v11i3.648Keywords:
Time, Cost, Crash Program, Microsoft ProjectAbstract
Project acceleration is a solution to speed up project completion. Project acceleration has various alternatives, including adding overtime hours and adding labor. This research aims to assess the changes in project time and costs following acceleration efforts through options such as increasing working hours (overtime) and adding labor. The project acceleration method used is the crash program method, supported by the Microsoft Project application. The research results show that for the option of adding overtime hours, with 1 hour of overtime, the cost was Rp 27,011,372,606.28 and the duration was 204.13 days; for 2 hours of overtime, the cost increased to Rp 27,156,499,375.32 with a duration of 199.01 days; with 3 hours of overtime, the cost was Rp 27,307,828,821.71 and the duration shortened to 194.62 days; and with 4 hours of overtime, the cost was Rp 27,465,750,984.13 with a duration of 190.92 days. For the alternative of adding labor, under a scenario equivalent to 1 hour of overtime, the cost was Rp 26,846,481,892.32 and the duration was 204.13 days; with 2 hours of overtime, the cost was Rp 26,797,919,204.37 with a duration of 199.01 days; with 3 hours of overtime, the cost decreased to Rp 26,746,499,142.20 and the duration was 194.62 days; and for 4 hours of overtime, the cost was Rp 26,703,236,580.04 with a duration of 190.92 days. Thus, adding labor is identified as an effective alternative due to its economical cost, even though it results in the same project acceleration duration.
Downloads
References
S. Bachmid, M. Apituley, and R. Musa, “Kajian Owner Estimate Dengan Assignment Method pada Proyek Pembangunan Stadion Bewela Kota Sorong,” J. Konstr. Tek. Infrastruktur dan Sains, vol. 1, no. 7, pp. 57–68, 2022.
W. I. Ervianto, MANAJEMEN PROYEK KONSTRUKSI. Penerbit Andi, 2023. [Online]. Available: https://books.google.co.id/books?id=jHLDEAAAQBAJ
D. Darmawan and A. Ratnasari, “Rancang Bangun Sistem Informasi Manajemen Proyek Berbasis Web Pada Pt Seatech Infosys,” J. Sisfokom (Sistem Inf. dan Komputer), vol. 9, no. 3, pp. 365–372, 2020, doi: 10.32736/sisfokom.v9i3.931.
Y. E. Azmi and A. S. Rahman Arifin, “Analisis Efektivitas Waktu dan Biaya Penambahan Jam Kerja Menggunakan Metode Time Cost Trade Off pada Proyek Rusun Kota Bukittinggi,” vol. 5, no. 2, pp. 252–259, 2024.
Peraturan Presiden RI, “PERATURAN PRESIDEN REPUBLIK INDONESIA NOMOR 16 TAHUN 2018 TENTANG PENGADAAN BARANG/JASA PEMERINTAH.” 2018.
Perpu, “PERATURAN PEMERINTAH PENGGANTI UNDANG-UNDANG REPUBLIK INDONESIA NOMOR 2 TAHUN 2022 TENTANG CIPTA KERJA.” Jakarta, 2022. doi: 10.19105/al-lhkam.v14i1.1982.
B. Wijanarko and W. Oetomo, “Analisis Percepatan Waktu Penyelesaian Proyek Dengan Metode Crashing Dan Fast Tracking Pada Pelebaran Jalan Dan Jembatan,” J. Penelit., vol. 1, no. 1, pp. 1–20, 2019.
D. Fardila and N. R. Adwayah, “Optimasi Biaya dan Waktu Proyek Konstruksi dengan Lembur dan Penambahan Tenaga Kerja,” vol. 17, no. 1, 2021.
Undang-Undang RI, “UNDANG-UNDANG REPUBLIK INDONESIA NOMOR 13 TAHUN 2003 TENTANG KETENAGAKERJAAN.” Jakarta, 2003.
M. F. Fakhrija, I. P. Mulyatno, and A. F. Zakki, “Jurnal teknik perkapalan,” vol. 8, no. 3, pp. 435–442, 2020.
N. P. O. Larashati, T. I. Praganingrum, and N. L. M. A. M. Pradnyadari, “ANALISIS MONITORING VARIAN WAKTU PELAKSANAAN PROYEK SETELAH TERJADINYA CONTRACT CHANGE ORDER MENGGUNAKAN PROGRAM MICROSOFT PROJECT,” vol. 4, no. 1, 2024.
R. Syarif, “Analisis Network Planning Pada Optimalisasi Waktu Dan Biaya Proyek Pembangunan Masjid BPJS Kantor Cabang Cileungsi Bogor,” Pros. Semin. Nas. …, pp. 187–197, 2020, [Online]. Available: http://repository.upi-yai.ac.id/3111/%0Ahttp://repository.upi-yai.ac.id/3111/1/Proshiding - Hal 187.pdf
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Wido Prasetya Dewanto, Henny Yustisia
This work is licensed under a Creative Commons Attribution 4.0 International License.