Evaluation of Excavator CAT 330 GC and Mitsubishi Fuso 220 PS Fleet Efficiency The Overburden Removal Target in Pit 2 of PT. Kurnia Alam Investama
DOI:
https://doi.org/10.24036/s2045z58Keywords:
Overburden Removal, Equipment Productivity, Cycle Time, Match Factor, Open-Pit MiningAbstract
Overburden removal is a critical determinant of production continuity in open-pit coal mining, yet inefficiencies in equipment utilization frequently hinder the achievement of production targets. At PT Kurnia Alam Investama, a monthly overburden stripping target of 150,000 BCM for February 2025 was established, to be achieved using two equipment fleets with a planned capacity of 75,000 BCM/month per fleet. However, preliminary observations indicate a discrepancy between planned and actual production, highlighting the need for a systematic evaluation of equipment performance and fleet compatibility. This study aims to assess the productivity and operational synchronization of a CAT 330 GC excavator and Mitsubishi Fuso 220 PS 6x4 HD dump trucks through cycle time analysis, productivity estimation, and match factor evaluation. The results show that actual productivity reached 67,150.72 BCM/month for the excavator and 52,407.4 BCM/month for the hauling units, both below the production target. The average cycle times were recorded at 0.343 minutes for the excavator and 5.39 minutes for the dump trucks. The calculated match factor (MF < 1) indicates an imbalance in the loading–hauling system, resulting in excavator idle time due to insufficient truck availability. The findings reveal that equipment condition and operator performance are the dominant factors affecting productivity losses. This study emphasizes the importance of fleet balancing, cycle time optimization, and operational improvements to enhance equipment utilization and achieve production targets efficiently.
Downloads
References
[1]. Alfarizi, P., & Prabowo, H. (2024). Assessment of Productivity and Compatibility of Komatsu PC 2000 Loader and Komatsu HD 785 Transport Equiptment in Overburden Stripping Activities in the North Pit of Muara Tiga Besar Mining Area at PT. Bukit Asam, Tbk. Tanjung Enim, South Sumatra. Bina Tambang, 9(1), 69-73.
[2]. Alifa, A., Gusman, M., & Prabowo, H. (2018). Optimasi Alat Gali Muat Dan Alat Angkut Terhadap Produksi Batubara Dengan Metode Kapasitas Produksi Dan Metode Teori Antrian Pada Pit Taman Periode Oktober 2016 Unit Pertambangan Tanjung Enim Pt. Bukit Asam (Persero) Tbk. Bina Tambang, 3(2), 807-818.
[3]. Ananda, A. D., Rahman, H. A., & Prabowo, H. (2023). Analisis Keserasian Alat Gali Muat dan Angkut Batubara Dalam Produksi Overburden Di Pit Alam 1-3 Di PT. Muara Alam Sejahtera, Kabupaten Lahat, Sumatera Selatan. Bina Tambang, 8(3), 33-41.
[4]. Ersyad, F., Yulhendra, D., & Prabowo, H. (2018). Kajian Teknis dan Ekonomis Perancangan Design Kemajuan Penambangan Quarry Batukapur pada Bulan April–Agustus 2017 di Front III B–IV B Bukit Karang Putih PT. Semen Padang. Bina Tambang, 3(3), 1185-1201.
[5]. Dian, M., & Prabowo, H. (2020). Produktivitas Pemboran Inpit pada Bukit Everest 9N2/TB. 19005, 9N2/TB. 19001, 9N2/TB. 19002 dan 9N2/TB. 19004 di PT. ANTAM Tbk. UBPN SULTRA. Bina Tambang, 5(2), 56-65.
[6]. Indonesianto, Yanto. 2014. Pemindahan Tanah Mekanis. Yogyakarta: Departemen Teknik Pertambangan UPN.
[7]. Hutmi, R., & Prabowo, H. (2022). Perhitungan Perbandingan Tonase Bauksit Menggunakan Data Truck Count, dan Tonase Hasil Analisa Laboratorium di Bauxite Processing Plant 1 dan 2 PT. Jaga Usaha Sandai-Site sandai, Sandai Kiri, Kecamatan Sandai, Kabupaten Ketapang, Kalimantan Barat. Bina Tambang, 7(1), 1-11.Shaddad, A. R. (2017). Analisis keserasian alat mekanis (match factor) untuk peningkatan produktivitas. Jurnal Geomine, 4(3).
[8]. Hendri, G. O., Maiyudi, R., Prabowo, H., & Anarta, R. (2023). Evaluasi Pengupasan Volume Overburden Menggunakan Data Truck Count Monitoring dan Joint Survey di Pit Batu Tegak PT. Andalan Artha Primanusa Jobsite PT. Budi Gema Gempita, Merapi Timur, Kabupaten Lahat, Sumatera Selatan. Bina Tambang, 8(2), 90-97.
[9]. Isgianda, F., Sumarya, S., & Prabowo, H. (2018). Evaluasi Biaya Dan Kebutuhan Alat Angkut Dan Alat Muat Pengupasan Lapisan Tanah Penutup (Overburden) Pit B PT. Bina Bara Sejahtera Kecamatan Ulok Kupai, Kabupaten Bengkulu Utara, Provinsi Bengkulu. Bina Tambang, 3(3), 1255-1261.
[10]. Nugraha, M. F. (2023). Optimalisasi Alat Gali Muat dan Alat Angkut pada Aktivitas Pengupasan Overburben Bulan Februari 2023 di Pit 4 SBE PT. Asia Multi Investama, Site Muaro Kilis, Tengah Ilir, Tebo, Jambi (Doctoral dissertation, Universitas Negeri Padang).
[11]. Prabowo, H., Premana, H., & Amrina, E. (2023). Keserasian Kerja Alat Gali Muat Excavator Volvo Ec330 Blc Dan Alat Angkut Dump Truck Mercedes Benz Axor 2528 C Pada Kegiatan Coal Getting Seam B. Jurnal Sains dan Teknologi: Jurnal Keilmuan dan Aplikasi Teknologi Industri, 23(1), 86-98.
[12]. Prabowo, H., & Marcelino, U. Z. D. (2023). Kajian Teknis Produktifitas dan Keserasian Excavator dengan Dump Truck pada Kegiatan Coal Getting Seam 18 PT. Kurnia Alam Investama Kabupaten Batanghari Provinsi Jambi. CIVED, 10(2), 398-408.
[13]. Prabowo, H., Hutmi, R., & Dewata, I. (2023). Optimizing Digging Equipment Productivity Using Overall Equipment Effectiveness (OEE) Method in Coal Overburden Mining Activities. INVOTEK: Jurnal Inovasi Vokasional dan Teknologi, 23(2), 99-108.
[14]. Prabowo, H., & Febriani, C. (2023). Analysis of the Relationship between Road Slope and Total Resistance to Fuel Consumption of Sany Skt 90s Dump Truck. MOTIVECTION: Journal of Mechanical, Electrical and Industrial Engineering, 5(2), 397-414.
[15]. Sosantri, B. J., Yulhendra, D., & Prabowo, H. (2018). Optimalisasi Peralatan Tambang dengan Metoda Overall Equipment Effectiveness (OEE) di PIT 1 Penambangan Batubara Banko Barat PT Bukit Asam (Persero) Tbk Tanjung Enim Sumatera Selatan. Bina Tambang, 3(2), 702-721.
[16]. Sandeir, E., & Prabowo, H. (2018). Evaluasi Kebutuhan dan Estimasi Biaya Alat Muat Kobelco 380 dan Hitachi 350 Dengan Alat Angkut Scania P360 dan Mercedez Actroz 4043 Pada Pengupasan Overburden PT. Caritas Energi Indonesia Jobsite KBB, Sarolangun. Bina Tambang, 3(3), 1091-1100.
[17]. Wati, M. F. A., & Prabowo, H. (2024). Mining Activities at the Pit 2 Electrification Mine Location at West Banko PT Bukit Asam, Tbk. Tanjung Enim, South Sumatera. Bina Tambang, 9(1s), 20-27.Anisari, Rezky. "Keserasian Alat Muat dan Angkut Untuk Kecapaian Target Produksi Pengupasan Batuan Penutup Pada PT. Unirich Mega Persada Site Hajak Kabupaten Barito Utara Kalimantan Tengah." Jurnal INTEKNA: Informasi Teknik dan Niaga 12.1 (2012).
[18]. Isgianda, F., Sumarya, S., & Prabowo, H. (2018). Evaluasi Biaya Dan Kebutuhan Alat Angkut Dan Alat Muat Pengupasan Lapisan Tanah Penutup (Overburden) Pit B PT. Bina Bara Sejahtera Kecamatan Ulok Kupai, Kabupaten Bengkulu Utara, Provinsi Bengkulu. Bina Tambang, 3(3), 1255-1261.
[19]. Zara, M., & Prabowo, H. (2020). Kajian Teknis Geometri Jalan Angkut dan Pengaruhnya Terhadap Produksi Alat Angkut pada Penambangan Batu Andesit di PT. Ansar Terang Crushindo 1Kecamatan Pangkalan Koto Baru, Sumatera Barat. Bina Tambang, 5(5), 20-31.
[20]. Zuhri, F. A. D., & Prabowo, H. (2024). GEOMETRY AND MAINTENANCE ANALYSIS OF ALL WHEATER ROAD (AWR) TS+ 35 TO TLS 2 TAMBANG AIR LAYA, PT. BUKIT ASAM, TBK. ANJUNG ENIM, SOUTH SUMATRA. Bina Tambang, 9(1), 11-18.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Andri Van Deni, Heri Prabowo

This work is licensed under a Creative Commons Attribution 4.0 International License.